"We want to innovate the design work for the land development such
as the construction of golf courses or housing areas by CIM(Construction
Information Modeling) technology".
Taking golf course improvement as opportunity, the company got an idea
to recreate and show how land form in the course will change and how
landscapes will be seen by user's eyes from the beginning of designing
with 3DVR. The company has been developing "3-dimensional design and
development support system" for land reclamation project, which is
based on a 3D real-time VR "UC-win / Road", and it has completed after
2 years (2013-2014) development cooperated with FORUM8. Mr. Hirai, the
technical manager of the company's technology and production division,
expects to take advantage of in various fields of development
resultstakes by taking a look back at the progression and implicating
evolvement.
Our user to introduce in this issue engages in the civil engineering of
a wide range of projects, Takenaka Civil Engineering & Construction
Co., Ltd. We focus on the technical department, located in the
technology and production division to support the company's
instructure, in charge of various correspondence to company-wide
technical issues.
The company has almost all lisences of FORUM8 products.
Especially, our program "Design Calculation of 3D Steelpipe Sheetpile
Foundation" which supports to design Steelpipe Sheetpile Foundation was
produced based on the company's contract development services. In that
vein, they introduced UC-win Road since the early stage. They put it
into practice and equips various functions required in land reclamation
projects described above, and it has led to the joint development of
new systems that can express the construction results reflecting the
differences in design effectively and efficiently in 3D · VR.
▲Mr. Taku Hirai, the technical manager of the company's technology and production division
Leading Technical Support for wide civil engineering work project |
Takenaka Group consists of companies involved in architecture,
construction and civil engineering(8 Construction
Business companies and 6 Management Engineering Business
companies) and uses Takenaka Corporation, originates from shrines and temples concrete business of the early Edo period, as its hard core. Takenaka Civil Engineering & Construction Co., Ltd. have one of the most history in this construction
business in Japan and is widely responsible for the civil engineering
business.
We can trace the company's establishment back to "Kyoei-Kai", that formed in 1937. Then succeeding the firm of "Kyoei-Kai", Kaigai Doboku Kogyo Co., Ltd. was founded. Using participation in the post-war reconstruction business of the country as a springboard, they repeated restructuring and business expansion. They changed their name to their current company name in 1973.
Nowadays
in addition to the Tokyo head office and Osaka office, they also have
the office in Hokkaido, Tohoku, Kanto, Kokusai, Yokohama, Nagoya,
Hiroshima, Shikoku, Kyushu and a number of offices in those areas and
in Indonesia(PT. Takenaka Indonesia). Near 900 employees are placed on
their base.
The company covers a wide range of business such as civil engineering, building construction, real estate-related, regional, urban and ocean
development, and consulting business. Constructed structure through the
involved businesses are positioned as "work", and they cover a lot of
fields like dams and railways, roads, tunnels and bridges, the
environment and water supply and sewerage systems, land reclamation,
harbors and rivers, energy.
In those business Mr. Hirai is the manager of Technical Department in Technology
and Production division as well as Technology Development Department in Institute of Technology. At the former they enforces preventivation maintenance of trouble on the quality, respond to technical problems, the provision of technical information for the sales support, and intellectual property-related business. At the latter each researcher sets theme which reflects more needs from Takenaka Civil Engineering & Construction and makes an effort to develop technology. On the other hand, the company is also focusing on the development of new technologies and construction methods.
Mr. Hirai makes mention of recent years' results as below. 1)
Construction method, developed after Tohoku earthquake(2011), with
downsized construction machines to achieve the same results as the
large machines when building a grid-like ground improvement body in a narrow space, such as residential areas in order to take measures for liquefaction and improve soil. 2) Build-out and application of the system capable of determining accurately the leading end's ground situation on the basis of the various types of measurement information obtained by the tunnel construction.
▲The flow of 3-dimensional design and development support system based on UC-win/Road
Job site needs and CIM correspondence are coupled
|
In the sense that the company-wide issues related to technology, CIM is one of the biggest business that Mr. Hirai has to tackle now.
sometime during that time at the golf course renovation which was consulted on as part of the land development business, which is the company's line, the needs emerged to get the ordering party to understand and experience
in advance "where and how we change so that guests who are on the
ground and play would see fairway in actual for example" or "What
happens to landforms and landscape after renovation at the design stage".
Until then, for example,
the person in charge once went back to the office and drew a plan when
the orderer required design modification. It was also inevitable to
have difficulty to communicate with each other via e-mail because of
the time lag. So it is said that there was an annoyance that they could not talk with their client in real time on the same table.
In
addition, even if they designed data with 3D-CAD and took it in the
drawing form to their clients, it was not come through that how it
would be seen in detail so it was difficult to judge design change.
Then they had to make another 3D picture from the data and take it to
the clients.
"It is because we cannot communicate smoothly that
we starts to think that if we can make something as the tool which is
able to make various things as talking with clients directly, using notebook PC or tablet".
That is, instead of corresponding passively to the
CIM led by Ministry of Land, Infrastructure, Transport and Tourism,
approach to embody CIM idea by themselves driven by needs in job site
began to move, Mr. Hirai reviews.
In that time UC-win / Road and 3D CAD had already been introduced to other businesses in the technology and design
division in the company's Tokyo head office, so they developed a new
system which makes full use of these. This time the concept was
drawn that brings technology which leads to automation construction furthermore and beyond from use of in the design phase into view.
Development of "3-dimensional design and development support system" |
Receiving this idea of desire to show in the design phase of the land reclamation project how landforms and landscape will be after renovation
in visual, development of "3-dimensional design and development support
system" based on "UC-win / Road" started in fiscal 2013.
It is made an arrangement that users can check the change in the landforms corresponding to the change of the 3D data from different angles
while they move the ground freely like a clay on 3D-VR, and that users
can reproduce golf course-specific landscape quite realistically.
Also, in addition to display subtle gradient like green superimposed on the VR, it corresponds that presentation of while changing the landform, and CAD by feedback of changed landform. It is able to show the change of the landscape accurately and instantly during the meeting at the clients.
While the technology and design division in the Tokyo head office, which had the golf course renovation that became the beginning of the system development, played a central role in the first year, the technology and design division in the
Osaka office joined in fiscal 2014, which had similar visualization
needs in housing land development. They made efforts for the function
enhancement such as responding to any shape input of the gradient shape, improvement of landform processing, golf course construction-related and soil amount calculation.
Especially, the surface function has been added in order to put the wireframe when terrain elevation is changed. It selects an arbitrary curve during terrain selection and automatically complements a mesh. And it is possible that textures can be changed on aerial photograph by height during the changing of terrain elevation to comprehend it easily in visual, and it is also possible to calculate soil amount calculation of elevation change places.
"At first, I imaged (mainly) the operation on a tablet". A variety of awareness in the process of system development are reflected. For example, while from the use scene of entering simply by
touching or showing, tablets are considered more practicable, it became
apparent that it is easier to use mouse in fact. Mr. Hirai says "I
think that we achieved to make it better than we have thought we
could".
|
▲Generation of terrain model, soil volume calculation function |
Utilization system and future development |
As described above, we introduced UC-win / Road from early on. As the case which puts importance on the landscape such as land reclamation projects in historic buildings increases, the characteristics of UC-win / Road which is realistic 3D-VR and can reproduce movement of human or wind have been highly regarded in-house, says Mr. Hirai.
On
the other hand, in the disaster site for example, it is needed to make
object under the situation of no drawings situation in
certain period, safely so that not to cause a secondary disaster. So it is expected in the future, that we survey from the sky by using drone (unmanned aircraft) and send the surveying data to design person of automatic operating construction machinery and offices in real time and reflect in the construction work immediately. He mentions that UC-win/Road will become the interface between people and equipment in such a scene.
Through this system development, the company realized certain functions which the company aimed. He remarks that from now on they aim to spread the application examples of the same system and to connect to appeal to the orderer the use merit.
▲ The member of Technology and Production Division
|